Grasshopper API
GH_DocumentScheduleSolution Method (Int32) |
Schedule a new solution after a specified time interval. The schedule is erased if another solution
is triggered before the schedule is executed. Tight schedules override loose schedules.
If this method is called during a solution, the schedule will be started
after the current solution completes.
Namespace: Grasshopper.Kernel
Assembly: Grasshopper (in Grasshopper.dll)

Parameters
- delay
- Type: SystemInt32
The delay (in milliseconds) between the completion of this solution and the start of the scheduled solution. If the delay is 1ms or more, a timer will be used to trigger a new solution sometime in the future. If a delay of 0ms is used, then the next solution will run recursively within the current solution. You should not use a delay of zero milliseconds too often as it will cause the Rhino process to run out of stack-space. The SolutionDepth property can be used to see how deeply recursive the solution currently is.
